The Old Gotthard Tunnel Route - Driver's Eye View

movie

movie poster for The Old Gotthard Tunnel Route - Driver's Eye View

Released October 01, 2018

Overview

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

Runtime

1h 52m


Origin Country

United Kingdom


Original Language

English


Original Title

The Old Gotthard Tunnel Route - Driver's Eye View


Status

Released


Production Countries

  • United Kingdom

Spoken Languages

  • English

Production Companies

  • no logo available

    Video 125

    United Kingdom

Crew

Posters

  • enlarged Poster 0